You don't have javascript enabled. Good luck with that.
Pencarian
 SDA Jakut Bangun 3 Crossing di Jl Kapuk Raya

Three Waterways Built on Jl. Kapuk Raya

North Jakarta Water Resources (SDA) Sub-dept. builds three waterways on Jalan Kapuk Raya, Kapuk Kamal Urban Village, Penjaringan to prevent inundation.

We build three waterways at once to avoid inundation on Jalan Kapuk Raya

North Jakarta SDA Sub-dept. Head, Santo said, those waterways have 9 meters, 12 meters, and 16 meters long. While for its construction will use concrete from manufacturer with 1 meter diameter.

"We build three waterways at once to avoid inundation on Jalan Kapuk Raya. We also dredge PHB channel on Jalan Kapuk Raya," he said, Friday (11/3).

11 Waterways Alerted at Flood-Prone Spots in North Jakarta

PHB channel dredging is done from Vooglar to ring road or near Cengkareng Drain River. Along these four kilometers, channel is dredged using three heavy equipment.

"It is targeted it to finish by the end of this November. It needs to be dredged since it is full of trash," he closed. 

Linked News
Popular News indeks
  1. City Council Strengthens Synergy with Central Legislators to Support Jakarta`s Development

    access_time30-07-2026 remove_red_eye1046 personFakhrizal Fakhri
  2. Jakarta Government Prepares Rp 249 B to Renovate Four Schools

    access_time25-07-2026 remove_red_eye882 personDessy Suciati
  3. Rano Urges Jakarta Scouts to Be Active in Waste Sorting Movement

    access_time25-07-2026 remove_red_eye700 personAldi Geri Lumban Tobing
  4. Pramono Encourages Residents to Stay Active at Rasuna Said CFD

    access_time26-07-2026 remove_red_eye630 personFolmer
  5. Jakarta Steps Up Food Waste Prevention

    access_time25-07-2026 remove_red_eye585 personAldi Geri Lumban Tobing